MN 28 over IRISH CREEK

2.4 MI N OF SWANVILLE · County 097, Minnesota · Built 1927 · 2 Lanes · 860 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
6078
Year Built
1927
Length
6.9 m (22.6 ft)
Max Span
3 m
Lanes
2
Daily Traffic
860
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$65,000,000
Total Project Cost
$30,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.