CSAH 9 over HIGH ISLAND CREEK

0.9 MI N OF JCT CSAH 12 · County 143, Minnesota · Built 1941 · 2 Lanes · 1,165 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5966
Year Built
1941
Length
16.2 m (53.1 ft)
Max Span
15.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,165
Material
Concrete
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$920,000,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.