T 67 over WATONWAN RIVER

1.3 MI W OF JCT CSAH 32 · County 165, Minnesota · Built 1929 · 2 Lanes · 35 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
5956
Year Built
1929
Length
13.7 m (44.9 ft)
Max Span
3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
35
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$132,000,000
Total Project Cost
$136,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.