CSAH 54 over MISSION CREEK

_ · County 115, Minnesota · Built 2005 · 2 Lanes · 367 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

45.918617, -92.979875

This bridge is in worse condition than 53.5% of bridges in County 115. The average bridge in Minnesota is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
58548
Year Built
2005
Length
20 m (65.6 ft)
Max Span
19.4 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
367
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$255,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.