CSAH 11 over MISSION CREEK

1.3 MI W OF JCT CSAH 53 · County 115, Minnesota · Built 1983 · 2 Lanes · 2,569 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

45.861897, -93.001058

This bridge is in worse condition than 53.5% of bridges in County 115. The average bridge in Minnesota is 0 years old; this one is 43 years old.

Nearby Bridges

Bridge Details

Structure #
58527
Year Built
1983
Length
25.5 m (83.7 ft)
Max Span
24.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,569
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.