US 63 over STREAM

7.1 MI N OF JCT TH 60 · County 157, Minnesota · Built 1927 · 2 Lanes · 2,434 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5826
Year Built
1927
Length
11.7 m (38.4 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
2,434
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$237,000,000
Total Project Cost
$81,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.