MN 200 over WILLOW RIVER

1.0 MI E OF REMER · County 021, Minnesota · Built 1938 · 2 Lanes · 1,118 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5622
Year Built
1938
Length
6.8 m (22.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,118
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$64,000,000
Total Project Cost
$25,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.