CSAH 37 over CHETAMBA CREEK

2.0 MI S OF MAYNARD · County 129, Minnesota · Built 1936 · 2 Lanes · 205 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

44.885558, -95.464219

This bridge is in worse condition than 75.5% of bridges in County 129. The average bridge in Minnesota is 0 years old; this one is 90 years old.

Nearby Bridges

Bridge Details

Structure #
5615
Year Built
1936
Length
13.1 m (43 ft)
Max Span
12.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
205
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$210,000,000
Total Project Cost
$300,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.