CSAH 75 over CLEARWATER RIVER

0.2 MI W OF CLEARWATER · County 145, Minnesota · Built 1936 · 2 Lanes · 3,260 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5608
Year Built
1936
Length
10.2 m (33.5 ft)
Max Span
3.2 m
Lanes
2
Daily Traffic
3,260
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$160,000,000
Total Project Cost
$75,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.