US 63 over STREAM

0.5 MI N OF JCT TH 247 · County 109, Minnesota · Built 2018 · 2 Lanes · 3,047 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
55X21
Year Built
2018
Length
6.9 m (22.6 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
3,047
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.