T 1 over N BR ROOT RIVER
ON W CO LINE ON 125th AV · County 109, Minnesota · Built 2005 · 2 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.841519, -92.689414
This bridge is in worse condition than 55.3% of bridges in County 109. The average bridge in Minnesota is 0 years old; this one is 21 years old.
Nearby Bridges
CR 149 over N BR ROOT RIVER
Built 1980
T 122 over STREAM
Built 2024
T 328 over N BR ROOT RIVER
Built 1973
T 179 over STREAM
Built 1979
CSAH 7 over N BR ROOT RIVER
Built 1977
CSAH 7 over STREAM
Built 2011
T 125 over STREAM
Built 1983
T 186 over STREAM
Built 1983
CSAH 1 over N BR ROOT RIVER
Built 2015
CSAH 3 over N BR ROOT RIVER
Built 1996
Bridge Details
- Structure #
- 55580
- Year Built
- 2005
- Length
- 34.4 m (112.9 ft)
- Max Span
- 11.3 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $395,000,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.