T 215 over CROW SPRING

0.9 MI E OF JCT CSAH 10 · County 109, Minnesota · Built 2000 · 2 Lanes · 70 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
55540
Year Built
2000
Length
16 m (52.5 ft)
Max Span
15.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
70
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.