MSAS 112 over CASCADE CREEK

0.4 MI N OF 2ND ST NW · County 109, Minnesota · Built 1959 · 4 Lanes · 4,950 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
55501
Year Built
1959
Length
24.8 m (81.4 ft)
Max Span
9.5 m
Width
19.3 m (63.3 ft)
Lanes
4
Daily Traffic
4,950
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$780,000,000
Total Project Cost
$94,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.