MSAS 122 over US 52

0.9 MI NW OF TH 14 · County 109, Minnesota · Built 2004 · 6 Lanes · 17,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
55043
Year Built
2004
Length
50.4 m (165.4 ft)
Max Span
24.8 m
Width
51.3 m (168.3 ft)
Lanes
6
Daily Traffic
17,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.