T 221 over SPRING CREEK

0.7 MI N OF JCT CSAH 13 · County 107, Minnesota · Built 2001 · 2 Lanes · 50 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
54J12
Year Built
2001
Length
9 m (29.5 ft)
Max Span
3.5 m
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.