CSAH 75 over ST AUGUSTA CREEK

1.5 MI SE OF JCT CSAH 7 · County 145, Minnesota · Built 1935 · 2 Lanes · 2,533 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

45.470294, -94.135578

This bridge is in worse condition than 82.6% of bridges in County 145. The average bridge in Minnesota is 0 years old; this one is 91 years old.

Nearby Bridges

Bridge Details

Structure #
5417
Year Built
1935
Length
16.1 m (52.8 ft)
Max Span
15.2 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
2,533
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$222,000,000
Total Project Cost
$130,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.