M 12 over CLEARWATER RIVER

0.1 MI W OF JCT TH 59 · County 125, Minnesota · Built 1935 · 2 Lanes · 59 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

47.923581, -96.045808

This bridge is in worse condition than 98.3% of bridges in County 125. The average bridge in Minnesota is 0 years old; this one is 91 years old.

Nearby Bridges

Bridge Details

Structure #
5407
Year Built
1935
Length
20.7 m (67.9 ft)
Max Span
19.5 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
59
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$196,000,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.