T 172 over STREAM

0.7 MI W OF JCT TH 59 · County 105, Minnesota · Built 2014 · 2 Lanes · 49 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
53J84
Year Built
2014
Length
15.8 m (51.8 ft)
Max Span
4.9 m
Lanes
2
Daily Traffic
49
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.