CSAH 8 over KANARANZI CREEK
1.7 MI W OF JCT TH 91 · County 105, Minnesota · Built 1964 · 2 Lanes · 165 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.572814, -96.04515
This bridge is in worse condition than 89.5% of bridges in County 105. The average bridge in Minnesota is 0 years old; this one is 62 years old.
Nearby Bridges
T 13 over UNNAMED STREAM
Built 2020
T 154 over STREAM
Built 1982
CSAH 15 over KANARANZI CREEK
Built 2015
T 13 over UNNAMED STREAM
Built 2020
T 13 over STREAM
Built 1978
T 13 over KANARANZI CREEK
Built 1996
CSAH 19 over STREAM
Built 1939
T 13 over STREAM
Built 1982
T 120 over STREAM
Built 1981
CSAH 6 over STREAM
Built 1949
Bridge Details
- Structure #
- 53505
- Year Built
- 1964
- Length
- 11.2 m (36.7 ft)
- Max Span
- 5.2 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 165
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $124,000,000
- Total Project Cost
- $40,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.