M 30 over MESABI TRAIL

IN COLERAINE · County 061, Minnesota · Built 1918 · 2 Lanes · 8,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

47.289875, -93.427736

This bridge is in worse condition than 82.5% of bridges in County 061. The average bridge in Minnesota is 0 years old; this one is 108 years old.

Nearby Bridges

Bridge Details

Structure #
5293
Year Built
1918
Length
9.7 m (31.8 ft)
Max Span
8.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
8,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000,000
Total Project Cost
$500,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.