T 189 over LIME CREEK

0.2 MI S OF JCT CSAH 6 · County 101, Minnesota · Built 2004 · 2 Lanes · 40 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
51J23
Year Built
2004
Length
14.8 m (48.6 ft)
Max Span
4.4 m
Lanes
2
Daily Traffic
40
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$323,000,000
Total Project Cost
$333,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.