T 17 over LIME CREEK

0.8 MI W OF JCT TH 59 · County 101, Minnesota · Built 1996 · 2 Lanes · 17 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
51J02
Year Built
1996
Length
16.2 m (53.1 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
17
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.