MN 61 over POPLAR RIVER
AT LUTSEN · County 031, Minnesota · Built 1931 · 2 Lanes · 3,650 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
47.639017, -90.707897
This bridge is in worse condition than 89.8% of bridges in County 031. The average bridge in Minnesota is 0 years old; this one is 95 years old.
Nearby Bridges
CSAH 5 over SKI RUN
Built 2018
CR 28 over ALFRED CREEK
Built 2024
MN 61 over ONION RIVER
Built 2009
NO DATA ENTERED over POPLAR RIVER
Built 2014
HONEYMOON TRAIL over TAIT RIVER
Built 2001
CROSS RIVER RD over TEMPERANCE RIVER
Built 2015
BLIND TEMPERANCE over BLIND TEMPERANCE CREEK
Built 2001
Honeymoon Trail over POPLAR RIVER CONSPAN
Built 2009
PANCORE LAKE ROAD over POPLAR RIVER
Built 1982
MN 61 over TEMPERANCE RIVER
Built 1931
Bridge Details
- Structure #
- 5089
- Year Built
- 1931
- Length
- 16.8 m (55.1 ft)
- Max Span
- 13.7 m
- Lanes
- 2
- Daily Traffic
- 3,650
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $370,000,000
- Total Project Cost
- $178,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.