MN 115 over MISSISSIPPI RIVER

AT CAMP RIPLEY · County 097, Minnesota · Built 1930 · 2 Lanes · 3,104 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

46.074197, -94.334253

This bridge is in worse condition than 84.8% of bridges in County 097. The average bridge in Minnesota is 0 years old; this one is 96 years old.

Nearby Bridges

Bridge Details

Structure #
4969
Year Built
1930
Length
125.6 m (412.1 ft)
Max Span
25 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
3,104
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.