MN 99 over MINNESOTA RIVER

IN ST PETER · County 079, Minnesota · Built 1931 · 2 Lanes · 5,548 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 5 Fair
Substructure 7 Good

Location

44.32495, -93.953311

This bridge is in worse condition than 85.3% of bridges in County 079. The average bridge in Minnesota is 0 years old; this one is 95 years old.

Nearby Bridges

Bridge Details

Structure #
4930
Year Built
1931
Length
122.6 m (402.2 ft)
Max Span
59.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
5,548
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.