T 76 over S FK CROW RIVER

0.9 MI S OF JCT TH 7 · County 093, Minnesota · Built 2004 · 2 Lanes · 60 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
47J10
Year Built
2004
Length
14.2 m (46.6 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
60
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$157,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.