I 90 over IM RAIL

1.6 MI E OF JCT TH 15 · County 091, Minnesota · Built 1973 · 2 Lanes · 5,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

43.671686, -94.417183

This bridge is in worse condition than 50% of bridges in County 091. The average bridge in Minnesota is 0 years old; this one is 53 years old.

Nearby Bridges

Bridge Details

Structure #
46822
Year Built
1973
Length
59.7 m (195.9 ft)
Max Span
19.3 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
5,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$947,000,000
Total Project Cost
$606,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.