M 154 over N CHANNEL MISS RIVER

MUN 154 OVER MISS RIVER · County 169, Minnesota · Built 1916 · 1 Lanes · 40 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
4260
Year Built
1916
Reconstructed
2003
Length
371.9 m (1220.1 ft)
Max Span
21.9 m
Width
7.5 m (24.6 ft)
Lanes
1
Daily Traffic
40
Material
Concrete Continuous
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$278,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.