MN 68 over STREAM

9.1 MI SE OF JCT US 75 · County 081, Minnesota · Built 2022 · 2 Lanes · 2,050 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
41X01
Year Built
2022
Length
7.1 m (23.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,050
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.