CR 136 over BIG CANNON RIVER

1.7 MI S OF JCT CR 138 · County 079, Minnesota · Built 1977 · 2 Lanes · 36 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
40510
Year Built
1977
Length
29.3 m (96.1 ft)
Max Span
9.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
36
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$637,000,000
Total Project Cost
$955,950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.