PVT 36 over SHAKOPEE CREEK
1.2 MI SE OF KERKHOVEN · County 151, Minnesota · Built 1924 · 2 Lanes · 1 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
3
Serious
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 3 | Serious |
| Substructure | 3 | Serious |
Location
45.181197, -95.295058
This bridge is in worse condition than 99% of bridges in County 151. The average bridge in Minnesota is 0 years old; this one is 102 years old.
Nearby Bridges
US 12 over SHAKOPEE CREEK
Built 1977
US 12 over BNSF RAIL
Built 1977
T 123 over SHAKOPEE CREEK (CD #18)
Built 1990
T 146 over SHAKOPEE CREEK (JD #19)
Built 1985
CSAH 35 over SHAKOPEE CREEK
Built 1981
T 223 over SHAKOPEE CREEK
Built 1987
T 5 over SHAKOPEE CREEK
Built 2008
T 111 over SHAKOPEE CREEK
Built 1997
CSAH 33 over MUD CREEK
Built 2009
CSAH 3 over SHAKOPEE CREEK
Built 1968
Bridge Details
- Structure #
- 4048
- Year Built
- 1924
- Length
- 13.1 m (43 ft)
- Max Span
- 12.2 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 1
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $144,000,000
- Total Project Cost
- $153,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.