CSAH 17 over DITCH

9 MI N OF ROOSEVELT · County 077, Minnesota · Built 1999 · 2 Lanes · 254 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
39J26
Year Built
1999
Reconstructed
2003
Length
6.2 m (20.3 ft)
Max Span
2.2 m
Lanes
2
Daily Traffic
254
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$58,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.