US 212 over FLORIDA CREEK

6.3 MI W OF JCT TH 75 · County 073, Minnesota · Built 1970 · 2 Lanes · 1,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37004
Year Built
1970
Reconstructed
2004
Length
37.9 m (124.3 ft)
Max Span
9.5 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
1,750
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$841,000,000
Total Project Cost
$684,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.