US 75 over STREAM

2.8 MI N OF JCT MN 175 · County 069, Minnesota · Built 2023 · 2 Lanes · 860 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
35X13
Year Built
2023
Length
7.4 m (24.3 ft)
Max Span
7.4 m
Lanes
2
Daily Traffic
860
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.