CSAH 61 over TALMADGE RIVER
0.3 MI N OF JCT CR693 · County 137, Minnesota · Built 1921 · 2 Lanes · 1,350 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.888725, -91.922708
This bridge is in worse condition than 84.2% of bridges in County 137. The average bridge in Minnesota is 0 years old; this one is 105 years old.
Nearby Bridges
CSAH 33 over TALMADGE RIVER
Built 1993
CSAH 61 over ACCESS RD
Built 2004
CR 281 over TALMADGE RIVER
Built 2014
CSAH 50 over FRENCH RIVER
Built 1962
CSAH 61 over FRENCH RIVER
Built 2020
CSAH 10 over LESTER RIVER
Built 1948
CSAH 43 over FRENCH RIVER
Built 1970
CR 259 over STREAM
Built 1980
CR 293 over STREAM
Built 1984
CSAH 61 over BIG SUCKER RIVER
Built 1950
Bridge Details
- Structure #
- 3597
- Year Built
- 1921
- Length
- 12.6 m (41.3 ft)
- Max Span
- 12.2 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,350
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $174,000,000
- Total Project Cost
- $330,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.