T 294 over S BR TWO RIVERS
1.4 MI E OF JCT TH 75 · County 069, Minnesota · Built 1982 · 2 Lanes · 40 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
48.731103, -96.895647
This bridge is in worse condition than 77.5% of bridges in County 069. The average bridge in Minnesota is 0 years old; this one is 44 years old.
Nearby Bridges
T 231 over S BR TWO RIVERS
Built 1995
CSAH 22 over S BR TWO RIVERS
Built 1966
US 75 over DITCH
Built 1925
T 85 over S BR TWO RIVERS
Built 1979
T 227 over CO DITCH # 8
Built 1985
T 230 over S BR TWO RIVERS
Built 2010
T 240 over MID BR TWO RIVERS
Built 1984
T 339 over STATE DITCH # 1
Built 1979
US 75 over STATE DITCH # 1
Built 1995
MN 175 over MID BR TWO RIVERS
Built 1969
Bridge Details
- Structure #
- 35518
- Year Built
- 1982
- Length
- 48.5 m (159.1 ft)
- Max Span
- 23.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $478,000,000
- Total Project Cost
- $478,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.