T 8 over JD # 7 HAWK CREEK

0.4 MI N OF JCT TH 23 · County 067, Minnesota · Built 2010 · 2 Lanes · 31 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
34J33
Year Built
2010
Length
13.4 m (44 ft)
Max Span
4.5 m
Lanes
2
Daily Traffic
31
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.