SPR 20 over BAPTISM RIVER

SW OF BRIDGE 38007 · County 075, Minnesota · Built 1923 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
3459
Year Built
1923
Length
116.7 m (382.9 ft)
Max Span
42.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Truss - Deck
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$964,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.