SPR 20 over BAPTISM RIVER
SW OF BRIDGE 38007 · County 075, Minnesota · Built 1923 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
47.337458, -91.200339
This bridge is in worse condition than 94.4% of bridges in County 075. The average bridge in Minnesota is 0 years old; this one is 103 years old.
Nearby Bridges
MN 61 over BAPTISM RIVER; PARK RD
Built 1968
MN 61 over PALISADE CREEK
Built 2005
MN 1 over BAPTISM RIVER
Built 1992
T 5054 over LINDSTROM CREEK
Built 2023
MN 61 over CONVEYOR TUNNEL
Built 1978
MN 61 over CONVEYER
Built 1952
CSAH 6 over E BR BAPTISM RIVER
Built 2011
MN 1 over W BRANCH BAPTISM RIVER
Built 1986
CSAH 4 over E BRANCH BEAVER RIVER
Built 2007
T 58 over HOCKAMIN CREEK
Built 2022
Bridge Details
- Structure #
- 3459
- Year Built
- 1923
- Length
- 116.7 m (382.9 ft)
- Max Span
- 42.7 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Truss - Deck
- Owner
- State Park, Forest, or Reservation Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $964,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.