CR 561 over SNOWBALL CREEK

0.1 MI E OF JCT US 169 · County 061, Minnesota · Built 1920 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

47.3312, -93.232947

This bridge is in worse condition than 82.5% of bridges in County 061. The average bridge in Minnesota is 0 years old; this one is 106 years old.

Nearby Bridges

Bridge Details

Structure #
3360
Year Built
1920
Reconstructed
1932
Length
6.7 m (22 ft)
Max Span
6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000,000
Total Project Cost
$310,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.