T 211 over JUD DITCH # 13

0.3 MI N OF JCT CR 68 · County 063, Minnesota · Built 1997 · 2 Lanes · 25 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
32J01
Year Built
1997
Length
9 m (29.5 ft)
Max Span
3.6 m
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$66,000,000
Total Project Cost
$70,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.