CSAH 9 over SKUNK CREEK

0.2 MI S OF JCT CSAH 4 · County 063, Minnesota · Built 1992 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
32546
Year Built
1992
Length
19.9 m (65.3 ft)
Max Span
19.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000,000
Total Project Cost
$149,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.