T 365 over OKABENA CREEK

0.2 MI W OF JCT CR 63 · County 063, Minnesota · Built 1997 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

43.717675, -95.379189

This bridge is in worse condition than 47.5% of bridges in County 063. The average bridge in Minnesota is 0 years old; this one is 29 years old.

Nearby Bridges

Bridge Details

Structure #
32539
Year Built
1997
Length
22.7 m (74.5 ft)
Max Span
8.5 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
30
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$231,000,000
Total Project Cost
$142,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.