T 100 over GORMAN CREEK

0.8 MI S OF JCT CSAH18 · County 157, Minnesota · Built 1919 · 2 Lanes · 33 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

44.298814, -92.008164

This bridge is in worse condition than 47.6% of bridges in County 157. The average bridge in Minnesota is 0 years old; this one is 107 years old.

Nearby Bridges

Bridge Details

Structure #
3066
Year Built
1919
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
33
Material
Concrete
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$111,000,000
Total Project Cost
N/A