MN 121 over I 35W

0.1 MI S OF W JCT MN 62 · County 053, Minnesota · Built 2007 · 2 Lanes · 6,050 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27V65
Year Built
2007
Length
207.2 m (679.8 ft)
Max Span
61 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
6,050
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.