CON 4293 over LRT; FRONT ROAD

AT THE JCT TH 35W · County 053, Minnesota · Built 2000 · 1 Lanes · 8,123 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27V28
Year Built
2000
Length
126.6 m (415.4 ft)
Max Span
29.5 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
8,123
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.