MSAS 457 over BNSF RR

0.1 MI N JCT DUNWOODY BLV · County 053, Minnesota · Built 2013 · 2 Lanes · 850 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
27B01
Year Built
2013
Length
187.4 m (614.8 ft)
Max Span
42.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
850
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.