M 81 over CHANNEL

TO SHADY ISLAND · County 053, Minnesota · Built 1997 · 2 Lanes · 260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27A34
Year Built
1997
Length
15.9 m (52.2 ft)
Max Span
6.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
260
Material
Wood or Timber
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$197,000,000
Total Project Cost
$128,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.