UNU 52 over I 94 ramp RR streets
0.3 MI SE OF JCT TH 94 · County 053, Minnesota · Built 1982 · 2 Lanes · 9,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
44.983283, -93.273233
This bridge is in worse condition than 71.1% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 44 years old.
Nearby Bridges
CON 4897 over 3rd Street North
Built 1990
UNU 52 over RR; STREETS TO I 94
Built 1982
CON 7528 over City parking lot
Built 1990
CON 1812 over BUS RAMP; WASH AVE RAMP
Built 1990
CSAH 152 over BNSF RR
Built 2001
MSAS 218 over I 394; RAMPS
Built 1986
MSAS 215 over BNSF RR
Built 1993
MSAS 218 over BNSF RR
Built 1992
MSAS 205 over BNSF RR
Built 1991
MSAS 221 over I 394
Built 1989
Bridge Details
- Structure #
- 27816S
- Year Built
- 1982
- Length
- 1046 m (3431.8 ft)
- Max Span
- 35.4 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 9,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.