M 57 over BNSF RR

0.1 MI S OF JCT CSAH 66 · County 053, Minnesota · Built 1990 · 2 Lanes · 1,949 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27678
Year Built
1990
Length
32.9 m (107.9 ft)
Max Span
11.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
1,949
Material
Concrete Continuous
Design
Slab
Owner
Local Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$738,000,000
Total Project Cost
$210,000,000