CSAH 4 over TC;W RR
1.1 MI N OF JCT TH 5 · County 053, Minnesota · Built 1960 · 2 Lanes · 7,234 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
44.877622, -93.485414
This bridge is in worse condition than 71.1% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 66 years old.
Nearby Bridges
MSAS 121 over DUCK LAKE
Built 2022
CSAH 62 over PURGATORY CREEK
Built 1994
MN 5 over US 212; WB ON RAMP
Built 1998
CSAH 4 over CSAH 62
Built 1993
MSAS 142 over PURGATORY CREEK
Built 2000
US 212 over WALLACE RD
Built 1998
MN 5 over WALLACE RD
Built 1998
MN 5 over WALLACE RD
Built 1998
US 212 over WALLACE RD
Built 1998
CSAH 62 over PURGATORY CREEK
Built 1994
Bridge Details
- Structure #
- 27502
- Year Built
- 1960
- Length
- 54.3 m (178.1 ft)
- Max Span
- 14.6 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 7,234
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.